Canadian and US flag Badger Daylighting logo  
Home | Francais | Site Map | Stock Quote | Disclaimer | Franchise Information  
Learn more about Badger Daylighting Investor Relations What is Daylighting?Excavating and trenching solutionsContact Badger Daylighting
Pipeline trenching and cleaningSlot TrenchingLarge Piping Excavation Vacuum Hydrovac work crewMen digging a trench  
 
 

Excavation
Solutions for:

Oil & Gas Pipelines
Utility Sector
Transportation Sector
Industrial Sector
Engineering Sector
  View Our:
Daylighting Video
Brochure
   
Badger Daylighting Logo
   
 

Pole and piling hole excavation

Pole Hole
Pole and piling holes.

Pole Holes

Digging installation holes (of varying diameter and depth) for all types of poles including: power poles, traffic signals, light standards, signs, fence posts, etc. A single Badger unit has dug as many as fifty pole holes 61cm (24”) diameter x 2.1m (7’) deep in one day.

Piling Holes

Digging installation holes and foundations for structural support (varying diameter and depth). Piling holes may be exploratory (friction piles) or full depth (end-bearing piles). Badger has installed as many as 1,000 piling holes on a single facility.

    Applications
  • Utility poles, traffic signals, light standards and sign posts
  • Pole removals and replacements
  • End-bearing piles
  • Pilot holes for friction piles
  • Spread footing piles
  • Well monitor installations

Back to Applications

 
   
 
Investor Relations | About Us | What is Daylighting? | Our Services | Contact Us
Home | Site Map | Disclaimer | Franchise Information